Photograph: Jon Evans

Works planned on the roads in and around East Knoyle

Roadworks Ahead

Roadworks Ahead


Wessex Water Mains Upgrade - The Street/Shaftesbury Road.

The main water pipe along The Street and Shaftesbury Road is due to be upgraded however these works have been postponed until 2019

More details will follow in due course and a map of the proposed works route can be downloaded from the link below.

Wessex Water East Knoyle Works (PDF)

You can contact Wessex Water directly on 0345 600 4 600 for further information.